Giza Dairy Products Manufacturing Plant
July 2023 6th of October City, Giza

Giza Dairy Products Manufacturing Plant

Project Overview

A dairy products manufacturer in 6th of October Industrial Zone was receiving 8–12 product rejection batches per month traced to inconsistent municipal water quality affecting pasteurization and packaging rinsing water. More Pure installed a central 800 m³/day water polishing system with activated carbon, softening, and RO, with a real-time quality monitoring dashboard linked to the plant's production QC system. Rejections dropped to zero within the first month of operation.

Project Gallery

Giza Dairy Products Manufacturing Plant - 1

Technical Details

System Capacity 800 m³/day
Technology Train MMF → AC → softener → RO
Product Rejections Before 8–12 batches/month
Product Rejections After 0 batches/month
Client Type Dairy food manufacturer

Similar Project for Your Facility?

Tell our engineers about your water challenge. We'll prepare a tailored response.

Get a Quote