Water Well Drilling Projects
Borehole drilling, development, and rehabilitation projects across Egypt's diverse aquifer systems.
Project Index
April 2023 Sharqia Governorate, East Delta
East Delta Agricultural Expansion — 6-Well Program
A large agricultural conglomerate expanding into newly reclaimed land in Eastern Delta required six boreholes drilled into the Quaternary aquifer to support 1,800 feddans of new farmland. More Pure conducted a geophysical survey to identify optimal drilling locations, drilled six boreholes to depths ranging from 120–180 meters, installed stainless steel casing and gravel packs, developed each well by step drawdown testing, and equipped each with submersible pumping systems rated for 150–220 m³/hour.
Number of Wells 6 boreholes
Drilling Depth 120–180 m
Target Aquifer Quaternary alluvial
View Details