Ain Sokhna Power Plant Cooling Tower Treatment
March 2024 Ain Sokhna, Suez Governorate

Ain Sokhna Power Plant Cooling Tower Treatment

Project Overview

A gas-fired power generation facility at Ain Sokhna was experiencing severe scaling in their cooling tower and heat exchangers, causing a 28% reduction in heat transfer efficiency and necessitating emergency shutdowns for cleaning every 3 months. The root cause was inadequate chemical dosing and no Legionella management protocol in place. More Pure designed a comprehensive cooling water treatment program — antiscalant, corrosion inhibitor, biocide — with automated online dosing, continuous ORP and pH monitoring, and a quarterly Legionella risk assessment protocol.

Project Gallery

Ain Sokhna Power Plant Cooling Tower Treatment - 1

Technical Details

Application Power plant cooling towers
Cooling Water Volume 8,000 m³ system volume
Challenge Solved 28% efficiency loss + Legionella risk
Program Components Antiscalant + inhibitor + biocide + monitoring
Client Type Gas-fired power generation