March 2023 Marsa Alam, Red Sea Governorate
Marsa Alam Beach Resort Desalination Plant
Project Overview
A five-star Red Sea resort required a fully independent water supply to eliminate dependence on long-haul tanker deliveries, which were costing the property over EGP 1.2 million per month. More Pure designed and commissioned a 500 m³/day seawater reverse osmosis plant using high-pressure duplex stainless steel pressure vessels with energy recovery devices, reducing the resort's water cost per m³ by 62% and eliminating all tanker deliveries within 60 days of commissioning.
Project Gallery
Technical Details
System Capacity 500 m³/day
Technology SWRO with energy recovery
Feed Water TDS 43,500 mg/L
Product Water TDS < 200 mg/L
Recovery Rate 40%
Energy Consumption 3.8 kWh/m³ (with ERD)
Client Type 5-star beach resort
Similar Project for Your Facility?
Tell our engineers about your water challenge. We'll prepare a tailored response.
Get a Quote